300L Beer Making Machine Beer Fermentation Machine Beer Brewing Equipment

Product Details
Customization: Available
Condition: New
Customized: Customized
Still deciding? Get samples of US$ 1/set
Request Sample
Manufacturer/Factory, Trading Company, Group Corporation

360° Virtual Tour

Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Plant Area
>2000 square meters
Management System Certification
ISO 9001
  • 300L Beer Making Machine Beer Fermentation Machine Beer Brewing Equipment
  • 300L Beer Making Machine Beer Fermentation Machine Beer Brewing Equipment
  • 300L Beer Making Machine Beer Fermentation Machine Beer Brewing Equipment
  • 300L Beer Making Machine Beer Fermentation Machine Beer Brewing Equipment
  • 300L Beer Making Machine Beer Fermentation Machine Beer Brewing Equipment
  • 300L Beer Making Machine Beer Fermentation Machine Beer Brewing Equipment
Find Similar Products

Basic Info.

Process
Ferment
Model
Hg-300L
Capacity
300L/Batch
Material
304 Stainless Steel
Combination Method
Mash/Lauter Tun, Kettle/Whirlpool Tank
Application
Restaurants, Bars, Hotels, Brewery
Water Consumption
3.5m3/T
out Size
950*2300mm
Floor Area
5m2
Degree of Automation
Semi-Automatic/Fully Automatic
Heating Way
Electric Heating/Steam Heating/Direct Fire Heating
Certification
CE ISO
Keywords
Beer Brewery Equipment
Insulation Layer
80mm-100mm
Control System
PLC
Warranty
3 Years
Transport Package
Wooden Case or Steel Frame
Specification
100L/ 200L/ 300L /500L/ 700L /1000L/ 2000L
Trademark
HG
Origin
Shandong
HS Code
8438400000

Product Description

300l Beer Making Machine Beer Fermentation Machine Beer Brewing Equipment

 


300L Beer Making Machine Beer Fermentation Machine Beer Brewing Equipment
Model HG-300
Capacity 300L/Batch
Material 304 Stainless Steel
Combination method Mash/lauter tun, kettle/whirlpool tank
Application Restaurants, bars, hotels, brewery
Heating way Electric heating/steam heating/direct fire heating
Voltage AC380/220V,50/60HZ
Out size Ø 910*2300mm
Floor area 5m2
Degree of automation Semi-automatic/Fully automatic

300L Beer Making Machine Beer Fermentation Machine Beer Brewing Equipment
300L Home and small model brewing equipment is designed for home brewer who brew for hobby, recipe testing,
teaching ets. According to the client's requirement, HG can produce stainless steel 304 brewhouse, copper
and etc.

300L Beer Making Machine Beer Fermentation Machine Beer Brewing Equipment
300L Beer Making Machine Beer Fermentation Machine Beer Brewing Equipment
300L Beer Making Machine Beer Fermentation Machine Beer Brewing Equipment
300L Beer Making Machine Beer Fermentation Machine Beer Brewing Equipment
Advantages of Beer equipment:
1. High cost performance.
2. Good abrasion resistance materialcopper beer equipment.
3. We all adopt SUS304 to produce our equipment. The inner jacket and seal head of the tanks are all 3.0mm.
The external jacket is
2.0mm. It ensure the good pressure resistance and good abrasion resistance.
4. Polishing accuracy up to Ra0.4μ m.
5. Strict tank pressure test.
6. Energy conservation and pollution emissions.
Item Production capacity Volume in US Gallon Heating area Tank diameter  Height
HG-50 50L/day 14US Gallon 0.15m2 550mm 1500mm
HG-100 100L/day 26US Gallon 0.25m2 650mm 2000mm
HG-200 200L/day 53US Gallon 0.25m2 910mm 2200mm
HG-300 300L/day 79US Gallon 0.3m2 910mm 2300mm
HG-500 500L/day 132US Gallon 0.5m2 1160mm 2400mm
HG-600 600L/day 158US Gallon 0.6m2 1160mm 2500mm
HG-700 700L/day 185US Gallon 0.7m2 1260mm 2500mm
HG-800 800L/day 212 US Gallon 0.8m2 1260mm 2500mm
HG-1000 1000L/day 264US Gallon 1.0m2 1360mm 2800mm
HG-1500 1500L/day 396US Gallon 1.5m2 1560mm 2900mm
HG-2000 2000L/day 528US Gallon 2.0m2 1960mm 3150mm
HG-2500 2500L/day 660US Gallon 2.5m2 1960mm 3200mm
HG-3000 3000L/day 792US Gallon 3.0m2 2060mm 3800mm
HG-5000 5000L/day 1320US Gallon 5.0m2 2260mm 4400mm
300L Beer Making Machine Beer Fermentation Machine Beer Brewing Equipment
300L Beer Making Machine Beer Fermentation Machine Beer Brewing Equipment
300L Beer Making Machine Beer Fermentation Machine Beer Brewing Equipment
300L Beer Making Machine Beer Fermentation Machine Beer Brewing Equipment
300L Beer Making Machine Beer Fermentation Machine Beer Brewing Equipment
300L Beer Making Machine Beer Fermentation Machine Beer Brewing Equipment
Our service

1.Pre-service:
-Layout:Sent us your building floor plan, or the sketch, or tell us the size (length, width, height), we will offer you an equipment footprint according to your requirement.
-Technical Drawings : We will offer Technical Drawings of each tank based on the equipment layout .
-3D effective sketch: We will 3D effective sketch to make sure ensure you have a more intuitive experience

2.After service
We guarantee the quality of the electrical elements within 1year and tanks body within 1 years. If the electrical elements go wrong without artificial factors within one year, we will freely provide them or maintain them for you.
After warranty, if you need to change parts, we will kindly provide you with the best price or maintain it in your site. Whenever you have technical question in using it, we will freely do our best to support. We can also dispatch our engineer to your brewery to install and adjust the machines for you. He can also train your staff to use the equipment.


FAQ
 

1.Q:Does your company have foreign installation experience?
A: Yes, our company has installation experience in USA, Canada, Europe, Australia, Malaysia, Myanmar, South Africa etc.
2.Q: Do you have a professional engineer or after-sales team in our country?
 A: Yes, our equipment is sold to 150 countries and areas and we have our local after-sales service personnel in Europe, America and Asia.
3.Q: How long is the delivery time?
A:The delivery time of beer equipment is 30-50 working days, the delivery time of filling machine is 45-50 working days.
4.Q:What payment methods are supported?
A:T/T, L/C, Credit Card, VISA, Apple device, Western Union.
5.Q: How long the warranty will be?
A: 3 years warranty for the whole tank and the main equipment, 1 year for the accessories and auxiliaries. 1 Year warranty for filling machine.
6.Q:How about the installation and training?
A:We can supply the installation and training. There are two options. The first option: We could appoint our engineer to your company to debug and repair, as for the cost of this trip such as ticket, visa, accommodation and labor cost shall be on your side. The second option: On-line service will be provided. If still under guarantee period, the necessary accessories and parts will be provided free, the buyer afford the transportation cost.
7.Q: Can I be your company's sales agent?
A: Yes, it's our pleasure. We very much welcome you to join us. Please contact us to discuss specific details.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier