Micro Brewery 500L 1000L 2000L Industrial Beer Brewery Equipment Beer Factory and Craft Beer Plant

Product Details
Customization: Available
Condition: New
Customized: Customized
Still deciding? Get samples of US$ 1/set
Request Sample
Manufacturer/Factory, Trading Company, Group Corporation

360° Virtual Tour

Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Plant Area
>2000 square meters
Management System Certification
ISO 9001
  • Micro Brewery 500L 1000L 2000L Industrial Beer Brewery Equipment Beer Factory and Craft Beer Plant
  • Micro Brewery 500L 1000L 2000L Industrial Beer Brewery Equipment Beer Factory and Craft Beer Plant
  • Micro Brewery 500L 1000L 2000L Industrial Beer Brewery Equipment Beer Factory and Craft Beer Plant
  • Micro Brewery 500L 1000L 2000L Industrial Beer Brewery Equipment Beer Factory and Craft Beer Plant
  • Micro Brewery 500L 1000L 2000L Industrial Beer Brewery Equipment Beer Factory and Craft Beer Plant
  • Micro Brewery 500L 1000L 2000L Industrial Beer Brewery Equipment Beer Factory and Craft Beer Plant
Find Similar Products

Basic Info.

Model NO.
HG-500L
Voltage
110V-480V
Composition
Beer Equipment
Processing Material
Wheat, Malt, Barley
Process
Ferment
Model
Hg-500
Capacity
500L/Batch
Material
SUS304/SUS316/Red Copper
Application
Restaurants, Bars, Hotels, Brewery
Heating Way
Stean Heating/ Electric Heating/ Direct Fire Heati
Power
27kw
Water Consumption
3.5m3/T
Diameter
1160mm
Height
2800m
Degree of Automation
Semi-Automatic/Fully Automatic
Certification
CE ISO
Polishing
0.4-0.6 Micron
Transport Package
Wooden Case or Steel Frame
Specification
300L /500L /1000L /2000L /3000L
Trademark
HG
Origin
Shandong
HS Code
8438400000

Product Description

beer brewery manufacturing equipment 500L beer brewing equipment complete set
Micro Brewery 500L 1000L 2000L Industrial Beer Brewery Equipment Beer Factory and Craft Beer Plant
Model HG-500
Capacity 500L/Batch
Material SUS304
Application Restaurants, bars, hotels, brewery
Heating way Stean heating/ Electric heating/ Direct Fire heating
Voltage AC380/220V,50/60HZ
Power 27Kw
Water consumption 3.5m3/T
Diameter 1160mm
Height 2400mm
Degree of automation Semi-automatic/Fully automatic

Micro Brewery 500L 1000L 2000L Industrial Beer Brewery Equipment Beer Factory and Craft Beer Plant
500L brewery equipment is widely used in brewery factory, restaurant and so on. It can brew pale lager, amber
lager, dark lager, ale and etc at proper temperature with different raw material. According to the client's requirement,
HG can produce stainless steel 304 brewhouse, copper and etc.
Micro Brewery 500L 1000L 2000L Industrial Beer Brewery Equipment Beer Factory and Craft Beer Plant

2-Vessel Main Features:
A typical two-vessel Combination Mash Lauter Tuns are the first combination vessel in these brewhouses
line ups.Next inline is the combination of the Kettle and Whirlpool tanks.
Micro Brewery 500L 1000L 2000L Industrial Beer Brewery Equipment Beer Factory and Craft Beer Plant
3-Vessel Main Features:
A three-vessel brewhouse is hybrid system that incorporates at least one combination vessel and two dedicated
process vessels.

 
Micro Brewery 500L 1000L 2000L Industrial Beer Brewery Equipment Beer Factory and Craft Beer Plant
4-Vessel Main Features:
A typical four-vessel brewhouse will include a Mash tun, Lauter Tun, Kettle and Whirlpool. Each of these tanks
is dedicated to performing a single process, and is designed differently than similar vessel used for performing
multiple processes.

Micro Brewery 500L 1000L 2000L Industrial Beer Brewery Equipment Beer Factory and Craft Beer Plant

Beer equipment advantages:

1). High cost performance.
2). Good abrasion resistance materialcopper beer equipment.
3). We all adopt SUS304 to produce our equipment. The inner jacket and seal head of the tanks are all 3.0mm.
The external jacket.
is 2.0mm. It ensure the good pressure resistance and good abrasion resistance.
4). Polishing accuracy up to Ra0.4μ m.
5). Strict tank pressure test.
6). Energy conservation and pollution emissions.
 
Item Production capacity Volume in US Gallon Heating area Tank diameter  Height
HG-50 50L/day 14US Gallon 0.15m2 550mm 1500mm
HG-100 100L/day 26US Gallon 0.25m2 650mm 2000mm
HG-200 200L/day 53US Gallon 0.25m2 910mm 2200mm
HG-300 300L/day 79US Gallon 0.3m2 910mm 2300mm
HG-500 500L/day 132US Gallon 0.5m2 1160mm 2400mm
HG-600 600L/day 158US Gallon 0.6m2 1160mm 2500mm
HG-700 700L/day 185US Gallon 0.7m2 1260mm 2500mm
HG-800 800L/day 212 US Gallon 0.8m2 1260mm 2500mm
HG-1000 1000L/day 264US Gallon 1.0m2 1360mm 2800mm
HG-1500 1500L/day 396US Gallon 1.5m2 1560mm 2900mm
HG-2000 2000L/day 528US Gallon 2.0m2 1960mm 3150mm
HG-2500 2500L/day 660US Gallon 2.5m2 1960mm 3200mm
HG-3000 3000L/day 792US Gallon 3.0m2 2060mm 3800mm
HG-5000 5000L/day 1320US Gallon 5.0m2 2260mm 4400mm

Micro Brewery 500L 1000L 2000L Industrial Beer Brewery Equipment Beer Factory and Craft Beer Plant
Micro Brewery 500L 1000L 2000L Industrial Beer Brewery Equipment Beer Factory and Craft Beer Plant
Micro Brewery 500L 1000L 2000L Industrial Beer Brewery Equipment Beer Factory and Craft Beer Plant
Micro Brewery 500L 1000L 2000L Industrial Beer Brewery Equipment Beer Factory and Craft Beer Plant
Micro Brewery 500L 1000L 2000L Industrial Beer Brewery Equipment Beer Factory and Craft Beer Plant
Micro Brewery 500L 1000L 2000L Industrial Beer Brewery Equipment Beer Factory and Craft Beer Plant
Our service

1.Pre-service:
-Layout:Sent us your building floor plan, or the sketch, or tell us the size (length, width, height), we will offer you an equipment footprint according to your requirement.
-Technical Drawings : We will offer Technical Drawings of each tank based on the equipment layout .
-3D effective sketch: We will 3D effective sketch to make sure ensure you have a more intuitive experience

2.After service
We guarantee the quality of the electrical elements within 1year and tanks body within 1 years. If the electrical elements go wrong without artificial factors within one year, we will freely provide them or maintain them for you.
After warranty, if you need to change parts, we will kindly provide you with the best price or maintain it in your site. Whenever you have technical question in using it, we will freely do our best to support. We can also dispatch our engineer to your brewery to install and adjust the machines for you. He can also train your staff to use the equipment.

FAQ

Q: Are you a manufacturer?
 A:Yes, We have more than 20 years in brewing and beer filling equipment.

Q: What is your available port of shipment?
A: Qingdao, Tianjin, Ningbo, Shanghai

Q: How could we confirm the details of the products?
A: We will provide all the drawings for you to confirm before production.

Q: How long the warranty will be?
A: 3 years warranty for the whole tank and the main equipment, 1 year for the accessories and auxiliaries.

Q: How about the installation and training?
A: We can supply the installation and training. There are two options. The first option: We could appoint our engineer to your company to debug and repair, as for the cost of this trip such as ticket, visa, accommodation and labor cost shall be on your side. The second option: On-line service will be provided. If still under guarantee period, the necessary accessories and parts will be provided free, the buyer afford the transportation cost.

Q: How do you guarantee the filling machine operation?
A: Before the delivery, we will test and debug all machines in good condition and record the video for your checking.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier