Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 1/set
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Malting Equipment is designed for those who demand the highest quality equipment and process control. Through a combination of time-tested and innovative methods, we empower Maltsters to grow the emerging Craft Malt industry. Our malting barley equipment are the result of detailed engineering, advanced technology and superior craftsmanship. We offer standard Malting machine designs over a range of batch sizes, but our strength as a custom fabricator/integrator can be leveraged to manufacture a system or individual components to your exact requirements.
Model | Capacity(kg/h) | Power (kw) | Size(mm) |
SLM250 | 250 | 6 | 2600x1000x1150 |
SLM500 | 500 | 11 | 3000x1200x1200 |
SLM750 | 750 | 15 | 3400x1400x1250 |
It consists of cleaning raw material, steep, germination, kiling and scale packing, its advantage: germination box is rectangle box, fan provides uniformity air from one end or side so as to achieve hu-miture control. Material transmission adopts mechanization, drying adopts single layer high efficiency kiln, double layer high efficiency kiln or round kiln.
The malting process starts with soaking the barley grains for 24 - 48 hours in a steeping vessel. During this time air is blown through the vessel (the steep) to add oxygen to the water and to cause a washing effect. Sand, dirt, and mould infested kernels are washed away resulting in a clean product. After approx 24 hours. the barley begins to sprout and the grain is transferred to the germination floor.
For seeds of any sort to sprout, a moist and warm environment is required. After the grains have been soaked they need to be rinsed and situated in a warm environment with light available to them. The moist barley is spread out and allowed to germinate in a warm and light environment. During this process the sprouting barley produces heat. To control the temperature of the sprouts, they have to be turned on a regular basis. Historically, this was done by hand, but in modern times it is done by mechanical turners. The modern techniques used in the malting, such as fan assisted aeration and cooling devices allow us excellent control over the malting process enabling a germination process of 5 to 6 days.
After the germination is complete, the grain is loaded onto the kiln floor. There the temperature increases gradually, drying the sprouted grains and stopping the germination process. As the temperature rises even more, the sprouted barley is cured, which improves flavor and preserves the malt.
Malt only uses state of the art, computerized kilns to ensure maximum quality control. The malted barley no longer comes into contact with the fumes from burning natural gases. Instead, the green malt is dryed using steam or heated air, thereby reducing the possibilities of impurities in smoke and fume being transferred to the barley.
The wheat gluten is produced from wheat flour. The wheat gluten making machine (also called gluten washing machine ) production process is making dough from wheat flour, then use water washing to separate the wheat starch and wheat gluten.
1.Q:Does your company have foreign installation experience?
A: Yes, our company has installation experience in USA, Canada, Europe, Australia, Malaysia, Myanmar, South Africa etc.
2.Q: Do you have a professional engineer or after-sales team in our country?
A: Yes, our equipment is sold to 150 countries and areas and we have our local after-sales service personnel in Europe, America and Asia.
3.Q: How long is the delivery time?
A: The delivery time of beer equipment is 30-50 working days, the delivery time of filling machine is 45-50 working days.
4.Q:What payment methods are supported?
A:T/T, L/C, Credit Card, VISA, Apple device, Western Union.
5. Q: How long the warranty will be?
A: 3 years warranty for the whole tank and the main equipment, 1 year for the accessories and auxiliaries. 1 Year warranty for filling machine.
6. Q:How about the installation and training?
A:We can supply the installation and training. There are two options. The first option: We could appoint our engineer to your company to debug and repair, as for the cost of this trip such as ticket, visa, accommodation and labor cost shall be on your side. The second option: On-line service will be provided. If still under guarantee period, the necessary accessories and parts will be provided free, the buyer afford the transportation cost.
7.Q: Can I be your company's sales agent?
A: Yes, it's our pleasure. We very much welcome you to join us. Please contact us to discuss specific details.